TRANSPORTATION PROJECTS
Kosi Embankment: Raising, Strengthening and Construction of Bituminuous Road (including Reconstruction / restoration of Structure) on Eastern Kosi Embankment frm 0 to 123.772 Km. and Eastern Kosi Main Canal (Right Bank) from 0.70 to 1.13 Km.(Indian Portion).
Client : Water Resources Department, Bihar
Road length : 125Km
Duration : 24 Months
Comments : Inaugurated by the Hon’ble Chief Minister of Bihar Mr. Nitish Kumar.
Punjab H.L.Bridge Over River Sutlej :Construction of High Level Bridge over river Sutlej including approaches Crossing Makhu to Sultanpur –Lodhi.
Client : Punjab PWD B&R Br.-Punjab
Duration : 15 Months.
Sitamadi: Construction of High Level Bridge Over River Bagmati on the Sitamarhi- Riga- Dheng- Bairgania Road its approaches, Guide Bunds and other road Appurtenances. Length of the Bridge is a 600meter with Span of the bridge 60mts.in the district of Sitamadi in the State of Bihar
Client : Bihar Rajya Pul Nirman Nigam Limited.
Duration : 2Years
Comments: The Project was Inaugurated by the Hon’ble Chief Minister of Bihar Mr. Nitish Kumar. The work is ahead of Schedule.
Gopalganj: Construction of 1500mts (1.5Kms) High Level Bridge over river Ghandak including 18Kms of Approach road near Bishunpur in Gopalganj District of Bihar State.
Client : BRPNNL
Duration : 3 Years
Kollur Outer Ring Road: Removing of black cotton soil from rail corridor in ORR from 12.000-23.700 works for the ORR PH-II A Package AP -2 Kollur to Patancheru, Andhra Pradesh.
BDA Outer Ring Road: Construction of six lane outer ring road with two service roads on either side of the highway from Km 51.880 to Km 700 in Bangalore.
CG-1 Chattisgarh: Rehabilitation and up gradation of Rajnandgaon (KM 0.00) to Mohla (Km 72.4) near Mohla – Chattisgarh State.
CG-II Chattisgarh: Quarrying and conversion of Boulders through one NO. 150 TPH and one NO. 60 TPH crushing and screening plants including operation and maintenance of DG sets near Mohla – Chattisgarh State.
Kalmala sindhnur: Construction of two bridges at KM 18.10 and Km 23 .30 in Kalmala sindhnur U1 Package in Karnataka State
Suryavamsi Estates: Earth Formation and laying of Roads at Suryavamsi township in Isnapur village in the City of Hyderabad of Andhra Pradesh.