Tadipudi Lift Irrigation: Construction of structures from Km 22.00 to 77.00 by mixing and placing of concrete for structures including cost of all materials shuttering and labour at Tadipudi East Godavari District of Andhra Pradesh.
R.B.C Jabalpur: Construction of structures, C.C lining of R.B.C Main Canal from Km 80.00 to Km 84.250 and Khagamau- distrubutory system off taking from RD 81.5 Km of R.B.C in Sihora, Jabalpur District, Madhya Pradesh.
Ranchi Tandwa: Construction of Spillway under Garhi Reservoir Scheme in block Tandwa of Jharkand State. Water Resource Department, Jharkand
Bapatla: Construction of Under Tunnel for Nallamada drain at Km 221.2 from the crossing of Commamuru canal at Km 64.8 near appapuram village, Kamumanu mandal of Krishna District of Andhra Pradesh State.
N.T.R Canal : PJP Package PL5 laying of C C lining from Km 28 to Km 37.4 on left main canal( N.T.R canal) in Mahabubnagar District in the State of Andhra Pradesh.
Telugu Ganga Project: Sri Satya Sai Telugu Ganga project lining work between CH 98 to CH 112 Km. earth work excavation for formation of sub grade in canal bed, inside slopes of canal banks with hard gravelly soil including construction of model walls and laying 100mm thick cement concrete M15 grade canal lining in the State of Andhra Pradesh.
Gandikota dam : Construction of Gandikota dam across Penna River and earth work excavation of GNSS main canal including construction of CM and CD works from KM 0.00 to Km 24.330 and construction of Head Regulator and formation off approach canal to Head Regulator and formation of approach road to Gandikota dam site near Mangapatman village in Caddapah district including investigation, preparation of Hydraulic particulars, design and drawings, Fabricating and erraction of Radial crest gates, Stop log gates, gantry cranes etc.In the District of Cuddapa of Andhra Pradesh.
Nagarjuna Sagar Right Canal: Construction at Chikategalapalem and Palakur in the State Of Andhra Pradesh.
Rapur I: Construction of Escape and Cross regulator, K P canal at Rapur and Concrete Lining work between Km 98 to Km 112, Nellor district of Andhra Pradesh
Rapur II: Construction of cross regulator at KM 25.25 at KP canal near Rapur, Nellor district of Andhra Pradesh.
Vishakapatnam- Duvvada: Clearing, Grubbing, Rock cutting,, Earth works , sub-grade filling of Road way, Construction of drain and excavation of foundation work of the structures falling of the area specified to the work at SEZ, Duvvada, Vishakapatnam Andhra Pradesh.